Skip to Main Content
Applied Ion Systems
  • Home
  • Products
  • Propulsion Systems
    • Active Thruster Systems
    • Retired Thruster Systems
  • Services
  • Thruster Rental Program
  • Reports
  • Collaborations
  • Sponsors
  • Gallery
  • Blog
  • DIY Science
  • Contact
  • LICENSES AND TERMS OF USE
  • Home
  • Products
  • Propulsion Systems
    • Active Thruster Systems
    • Retired Thruster Systems
  • Services
  • Thruster Rental Program
  • Reports
  • Collaborations
  • Sponsors
  • Gallery
  • Blog
  • DIY Science
  • Contact
  • LICENSES AND TERMS OF USE

engineering

High Vacuum System Example Design Walkthrough – 07
6 Mar 2018

High Vacuum System Example Design Walkthrough – 07

by AppliedIonSystems | posted in: Walkthrough | 0

FORELINE PARAMETERS AND PUMPDOWN TIME CALCULATION FROM ATMOSPHERE TO ROUGH VACUUM SYSTEM DESIGN V4 From the previous chapters, the major and critical vacuum parameters were explored and calculated for the V4 design. This section will cover the final main calculations for … Continued

engineering, foreline pump, high vacuum, high vacuum design, pumpdown time, roughing pump
High Vacuum System Example Design Walkthrough – 01
27 Feb 2018

High Vacuum System Example Design Walkthrough – 01

by AppliedIonSystems | posted in: Walkthrough | 0

INTRODUCTION This is the first of a short series dealing with the high vacuum calculation and design of a small scale multipurpose high vacuum system for use in a wide range of charged particle beam and plasma experiments. Since this … Continued

engineering, high vacuum

Recent Posts

  • Third Full System Ignition Test of the AIS-EHT1 Micro End Hall Thruster Scheduled LIVE!
  • AIS Presentation at IIT Madras Research Scholars Day 2021
  • Old School Photo Shoot with AIS Thrusters!
  • Recap of the Second Full System Ignition Test of the AIS-EHT1 Micro End Hall Thruster
  • Second Full System Ignition Test of the AIS-EHT1 Micro End Hall Thruster Scheduled LIVE!

Recent Comments

    Archives

    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • February 2019
    • January 2019
    • October 2018
    • August 2018
    • May 2018
    • March 2018
    • February 2018

    Categories

    • General Announcements
    • Introduction
    • Press Releases
    • System Build
    • Testing
    • Uncategorized
    • V4 System Build
    • Walkthrough

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Follow @

    © 2023 Applied Ion Systems - WordPress Theme by Kadence WP